He Mined in UAE & Ethiopia. Both Turned Against Him.
Cheap power means nothing if the government turns against you. Giannis Andreou, CEO of Bitmern Mining, started hosting Bitcoin miners in the UAE on agricultural power below 6¢/kWh, was forced out when the government banned that power, moved to Ethiopia, and is now watching the same story repeat as the Ethiopian government takes over mining and large operators pack up and leave.
Giannis breaks down what went wrong in both countries, why it took 45 days to get his miners out of the UAE, how Ethiopia's uptime fell to 70% before things got worse, and why exporting miners from Ethiopia comes with a 35% tax. His conclusion: own the land and the infrastructure, or don't build on it at all.
We also cover his pivot to buying two farms in Texas (5.5 MW and 8 MW), why AI data centers pay 17 to 25¢/kWh while he found power at 3.9¢, why he stopped retail hosting, a 20 MW joint venture opportunity in Brazil, and how he borrowed against mined Bitcoin to pay for power at $25K and held it to $107K.
Nothing discussed is financial advice. Do your own diligence before making mining or hosting decisions.
Guest: Giannis Andreou, Founder & CEO of Bitmern Mining
Bitmern Mining: https://www.bitmernmining.com
Bitmern on YouTube: https://www.youtube.com/@bitmernmining
Giannis on X: https://x.com/gandreou007
Giannis on Instagram: https://www.instagram.com/gianisandreou
Giannis on LinkedIn: https://www.linkedin.com/in/giannisandreou/
Timestamps:
0:00 Intro
0:46 From crypto YouTuber to Bitcoin miner
2:23 Central banks and the case for mining
4:21 Greece, Cyprus and the banking crisis
6:39 Why the UAE in 2023
7:35 Agricultural power below 6¢/kWh
8:43 Renting farms vs building your own
9:29 How to choose a hosting partner
11:07 Leaving the UAE: 45 days to move miners
12:30 UAE loopholes and $600K per MW capex
13:38 Ethiopia: from great to complete disaster
15:02 The lesson: own the land and the farm
15:45 Sponsor: Altair Technology
16:16 Why 30 minutes from the airport is a red flag
17:40 The pivot: buying 5.5 MW and 8 MW in Texas
18:37 Bitcoin mining vs AI: 3.9¢ vs 25¢/kWh
21:12 Why he stopped retail hosting
22:56 Finland, Norway and the hidden costs abroad
23:44 Ethiopia's 35% export tax on miners
24:44 Manufacturer JVs and 20 MW in Brazil
25:51 Is Bitcoin mining becoming institutional only?
27:31 Why hashrate didn't drop at $60K
28:36 Will Bitcoin average above $120K?
30:31 Borrowing against BTC to pay for power
32:51 Communicating downtime to customers
34:18 Bribes, quotas and the 20% energy rule
35:24 Wrap-up
Sponsored by:
Altair Technology. ASIC hardware, replacement parts and mining infrastructure
Code: HASHRATEUP
https://altairtech.io/aff/125/
HashrateUp Hardware Deals: https://t.me/hashrateup
Free 5-Day Bitcoin Mining Course: https://hashrateup.com/newsletter-sign-up/
#BitcoinMining #Ethiopia #UAE #BitmernMining #TexasMining #MiningHosting #HashrateUp
Mais episódios de "HashrateUp - A Bitcoin Mining Podcast"



Não percas um episódio de “HashrateUp - A Bitcoin Mining Podcast” e subscrevê-lo na aplicação GetPodcast.