The PODTalk PODcast podcast

106: Migration to Prefabricated Cleanrooms

0:00
11:38
Reculer de 15 secondes
Avancer de 15 secondes

In the biopharmaceutical industry, there has been a shift away from
on-site construction to prefabricated solutions. Peter Makowenskyj,
Director of Sales Engineering at G-CON Manufacturing Inc., recently
told Pharmaceutical Technology that speed to market and lower
total cost of ownership for facilities has accelerated this movement in the biopharma sector. He also discussed the strain that the COVID-19 pandemic has placed on operations across the industry and how the situation is creating a need for additional capacity.

D'autres épisodes de "The PODTalk PODcast"