Construction podcast

Quantity Surveying BSc Hons - CR570

10/03/2012

Construction

Partager
0:00
NaN:NaN:NaN
Reculer de 15 secondes
Avancer de 15 secondes
Quantity Surveying aims to provide value for money through the efficient cost management of the construction process. The objective of Quantity Surveying is to control cost, limit risk and add value to a project.

D'autres épisodes de "Construction"

  • Construction podcast

    Construction Management BSc Hons - CR572

    10/03/2012

    Construction Management deals with the organisation and management of a construction project. The Construction Manager monitors the progress and quality of the work on site, supervising and co-ordinating subcontractors and specialist suppliers. The Construction Manager has overall control of the progression of the project and is responsible for ensuring that the required personnel, materials and equipment are available in the correct sequence and at the appropriate time. She/he must also ensure that all health and safety regulations are met.
  • Construction podcast

    Quantity Surveying BSc Hons - CR570

    10/03/2012

    Quantity Surveying aims to provide value for money through the efficient cost management of the construction process. The objective of Quantity Surveying is to control cost, limit risk and add value to a project.
  • Construction podcast

    Ne ratez aucun épisode de “Construction” et abonnez-vous gratuitement à ce podcast dans l'application GetPodcast.

    iOS buttonAndroid button

Découvrez le meilleur des podcasts sur l'application GetPodcast.

Abonnez-vous à tous vos podcasts préférés, écoutez les épisodes sans connexion internet et recevez des recommandations de podcasts passionnants.

iOS buttonAndroid button
  • Politique de confidentialité
  • Mentions légales
  • France
© radio.de GmbH 2026radio.net logo
Une entreprise deMADSACK