Going to bid is not just about sending drawings to trade partners and waiting for numbers to come back. In this episode, Jason breaks down the planning, estimating, scoping, and documentation that need to happen before a contractor can confidently determine whether a project is truly within budget. Jason explains how the macro Takt plan, logistics plan, zoning strategy, risk and opportunity register, general conditions, general requirements, contingencies, and subcontractor pricing all connect. He also walks through bid packages, quote leveling, control estimates, and the information trade partners need before a reliable GMP or project price can be established.
What you'll learn in this episode:
- Why the overall construction plan must come before accurate estimating.
- How schedule duration, logistics, zoning, and risk influence project costs.
- Why bid packages need clear scopes and complete project information.
- How quote leveling creates an apples-to-apples comparison between trade partners.
- Why early planning is essential before committing to a GMP or final project budget.
Are you going to bid with a complete construction strategy or asking the market to price a project you haven't fully planned yet?
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Weitere Episoden von „Elevate Construction“



Verpasse keine Episode von “Elevate Construction” und abonniere ihn in der kostenlosen GetPodcast App.