
Ontario has pledged to build 1.5 million new homes by 2031, but can our power grid actually handle the demand? In this episode of Classonomics, Sabrina Maddeaux and Mike Moffatt break down the $100B–$120B "last mile" infrastructure crisis quietly halting major housing projects across the province, including thousands of stalled homes in Brooklin, Whitby, and Ajax.
From the historical legacy of Sir Adam Beck’s publicly owned hydro model to modern electrification demands like EVs and heat pumps, we discuss why developers are being pushed to fund local grid expansions and what policy fixes, such as tax-exempt utility bonds and reforming the tax code’s 90/10 rule, can keep Ontario’s housing goals alive.
Topics Covered:
- Can Ontario’s Grid Handle 1.5 Million New Homes?
- Mega Transmission Lines vs. The Real Grid Bottleneck
- What is the "Last Mile" in Power Distribution?
- Case Study: Why 10,000 Homes Stalled in Brooklin, ON
- Skyrocketing Household Load: Heat Pumps & EV Chargers
- History Lesson: Sir Adam Beck & Ontario’s Original Power Vision
- "Build Ahead" vs. "Pay to Play": The Shift in Infrastructure Financing
- The Role of Local Distribution Companies (LDCs)
- Two Policy Fixes: Tax-Exempt Utility Bonds & Reforming the 90/10 Rule
#OntarioHousing #CanadianPolitics #HousingCrisis #EnergyGrid #Infrastructure #TheMissingMiddle #SabrinaMaddeaux #MikeMoffatt
Chapters:
00:00 Can Ontario's Grid Power 1.5 Million Homes?
01:43 The "Last Mile" Bottleneck & Stalled Developments
04:00 EV Demand & Ontario's Electrification History
05:29 Public Utilities vs. "Pay for Growth"
07:14 Local Distribution Companies & Funding Friction
10:11 Two Policy Solutions to Fix Grid Financing
12:07 Final Thoughts & Outro
Research/links:
North America’s electricity grid is ready to grow. Manufacturers needed to build it are placing their bets
Electrical Load map:
https://oeb.planview.ca/Ontario-capacity-map/
Debt/Deficit MissingMiddle Episode referred to in video:
https://www.youtube.com/watch?v=H2zza3GwZ7E
Why a multibillion-dollar electricity infrastructure gap is threatening Ontario’s housing goals
Tracking housing supply progress
https://www.ontario.ca/page/tracking-housing-supply-progress#section-0
Ontario Launches Expert Panel to Strengthen Local Electricity Distribution
2025 Ontario Economic - Outlook and Fiscal Review
https://drive.google.com/file/d/1oTK_RueWPjD1Oc1YXVlT8nslnx9Ue_w6/view
Forward Guidance: Canada’s Energy Future.
https://www.youtube.com/watch?v=bySyMcg-p_4
Adam Beck
https://thecanadianencyclopedia.ca/en/article/sir-adam-beck
Build Faster Fund
https://opencouncil.ca/program/building-faster-fund/
An early history of hydroelectric power in Niagara Falls
https://nflibrary.ca/articles/an-early-history-of-hydroelectric-power-in-niagara-falls
Ontario’s electric history
https://thevarsity.ca/2026/02/03/ontarios-electric-history/
To Build More Homes, Ontario Launching Building Faster Fund and Expanding Strong Mayor Powers
Hosted by Mike Moffatt & Cara Stern & Sabrina Maddeaux
Produced by Meredith Martin
Funded by the Neptis Foundation https://neptis.org/
More episodes from "The Missing Middle Podcast"



Don't miss an episode of “The Missing Middle Podcast” and subscribe to it in the GetPodcast app.








