Machine Shop Mastery podcast

144. Growing a Second-Generation Machine Shop Through Automation and High-Volume Production

0:00
45:43
Rewind 15 seconds
Fast Forward 15 seconds

Thirty CNC machines and a team of about 14–15 people. That ratio immediately caught my attention when I sat down with Tim from Lakes Area Manufacturing. This second-generation family shop in Minnesota has embraced bar feeders, robot tending, pallet systems, and automated inspection to produce critical defense components—and give its people more time to focus on work that requires their skills.

Tim grew up sweeping floors and running equipment before earning his mechanical engineering degree and eventually returning to the family business full time. We explore how the shop evolved from its early defense contracts into high-volume machining and value-added assemblies, along with the investments that made that growth possible. Tim also shares why in-process probing became such a game changer for reliable unattended production.

But this conversation goes beyond robots. What happens when you identify a better way to make a part, yet getting permission to change the process could take months? We dig into the realities of frozen processes in defense manufacturing, the tension between consistency and continuous improvement, and the challenges of growing within those constraints. 

Along the way, we discuss outside processing bottlenecks, implementing an ERP system, and why finding your niche and going above and beyond for customers still matter.

What's Covered in this Episode

  • (0:00) Why measuring parts in the machine changed everything
  • (1:09) A 30-machine, 14-person shop running mostly unattended in rural Minnesota
  • (3:25) Lakes Area Manufacturing: volume production, 90% DoD work, 70% turning
  • (6:31) 30 CNCs, 14 people, and five robot cells in three years
  • (7:17) Second generation: from sweeping floors to mechanical engineer
  • (8:53) Hennig Workflow: compact pallet automation for more spindle uptime
  • (9:44) How a prime's supplier problem started the business in 1994
  • (12:16) 9/11, COVID delays, then steady growth ever since
  • (14:30) Diving into automation: FANUC Robodrill cells, a turnkey Kitamura cell, and two Halter cells
  • (17:31) Robots take the boring work, and the machinist hierarchy of needs
  • (19:40) Five hand-loaded cells down to one horizontal with a pallet pool
  • (21:08) Palletized CMM runs and in-process probing for unattended work
  • (24:41) Frozen processes: first article, PCA, and approvals for every change
  • (27:36) Kennametal: tooling built for real shop floor demands
  • (28:25) The case for freezing: a supplier that changed its process mid-run
  • (31:26) A comparator that couldn't move walls and a nine-month shutdown
  • (32:19) $50 billion platforms versus drone-speed startups
  • (34:43) CMMC 2.0 and why small shops need a tiered approach
  • (36:11) Navu: AI chat for your website, trained on your own content
  • (37:25) Automation is the future: get on the wagon or get left behind
  • (38:15) The challenges Tim is facing and how they're tackling them head-on
  • (41:16) Tim's advice for shops who are early in their journey

Resources Mentioned

Connect with Tim Banttari

More episodes from "Machine Shop Mastery"