The EBFC Show podcast

Mastering the Last Planner System with Victor Ortiz Part 4

2025-10-01
0:00
1:21:09
Spola tillbaka 15 sekunder
Spola framåt 15 sekunder

What if the biggest barrier to Lean success isn’t the trades or the tools — but the way we think about planning itself? 🤔

 

In this episode of The EBFC Show, Victor Ortiz and host Felipe Engineer-Manriquez continue their deep dive into the Last Planner System®, uncovering the principles and practices that separate sticky notes on a wall from a true production control system. From flawed procurement processes to the hidden impact of variation and buffers, they reveal why most teams miss the point — and how to get it right.

 

📌 Key Takeaways You’ll Gain:

  • The five Lean principles that anchor Last Planner to true customer value
  • Why dependency + variation create traffic jams on projects 🚦
  • How to use buffers (capacity, inventory, and time) to protect flow
  • The 3S criteria (Size, Sequence, Soundness) for defining reliable tasks
  • Why constraint analysis is non-negotiable for reliable commitments
  • The five levels of organizational change every Lean leader must navigate

 

If you’ve ever wondered why Last Planner works brilliantly in some teams but fizzles in others, this episode offers the clarity you’ve been waiting for.

 

🎧 Listen now, and don’t forget to like, share, and subscribe for more insights that make construction easier and better! 🚀

 

Part 3: Turning Resistance into Results: Mastering the Last Planner System with Victor Ortiz Part 3 https://www.theebfcshow.com/Victor-Ortiz-LPS-Part3/

Part 2: Fake Last Planner System with Victor Ortiz https://www.theebfcshow.com/Victor-Ortiz-LPS-Part2/ 

Part 1: Transforming Construction: Last Planner System Deep Dive with Victor Ortiz https://www.theebfcshow.com/LPS-with-Victor-part1/

 

---

Connect with Victor via

LinkedIn at https://www.linkedin.com/in/victor-ortiz-671301/

 

 

Connect with Felipe via

Social media and Free Lean and Scrum Training Resources at https://thefelipe.bio.link 

RSM Podia Course Link: https://store.theebfcshow.com/rsm

Subscribe to never miss new videos here: https://click.theebfcshow.com/youtube   

Watch The EBFC Show Podcast https://click.theebfcshow.com/YouTube-Podcast

 

---

Today's episode is sponsored by the Lean Construction Institute (LCI). This non-profit organization operates as a catalyst to transform the industry through Lean project delivery using an operating system centered on a common language, fundamental principles, and basic practices. Learn more at https://www.leanconstruction.org 

 

 

Elevate your construction career and enhance your company's performance by mastering the crucial aspect of building enclosure management with Field Verified's specialized training. Address the major challenge of managing building enclosures, a common source of construction failures. Get hands-on learning experience with real-world construction scenarios and mock-up installations for skill-building with leadership and team-focused strategies. By joining our course, you gain access to a proven program that not only covers technical aspects but also better practices for effective construction management. Don't miss this opportunity to transform your approach. Visit https://fieldverified.com for more insights, or contact us at 480-719-5090. 

 

Fler avsnitt från "The EBFC Show"