0:00
23:24
Data center developers face a difficult choice: wait years for a traditional grid connection, or build their own power systems and operate independently of the grid.
But a third path is emerging. By bringing onsite generation, batteries, and sophisticated software controls, data centers can be more flexible when the grid is constrained — and potentially connect to the system faster.
But batteries alone don't make a data center flexible. They need to be coordinated in real time to meet the demands of the facility, the utility, and the broader electricity market.
And the stakes go well beyond the data center industry. If these new loads can help utilities avoid expensive infrastructure upgrades, they could also help limit electricity bill increases for a wider range of consumers.
In this partner episode, produced in collaboration with Verse, Stephen Lacey talks with Seyed Madaeni, co-founder and CEO of Verse.
They talk about the growing role of flexibility in connecting data centers. How do we ensure the rush to power AI allows us to build a more distributed, resilient, and affordable electricity system?
This episode was produced in partnership with Verse. Verse helps large energy buyers secure power faster and manage electricity costs through intelligent software that optimizes energy procurement, batteries, and onsite power assets. Learn how Verse is helping data centers unlock faster grid connections through flexibility.