A boom in off-balance-sheet data center development is made possible by the good credit of hyperscaler customers, says Harold Chen, Senior Director in Fitch's Complex Credit Group.

In a conversation with Cool Vector, Chen says he expects courts to enforce the guarantees made to these special-purpose vehicles, and to their underlying bondholders, should hyperscalers find it necessary to walk away from data center lease agreements. 

Chen joins Hadassa Lutz, a partner at Cloud2Ground and host David Snow to explain how these partnership structures are designed to isolate projects and protect lenders, making it difficult to “throw a wrench” into the flow of cash used to repay that debt. But construction delays, power constraints, lease terms and performance requirements can still complicate the equation.

Among the key takeaways of this conversation:

• Shorter, rolling lease terms (say, four-year renewals instead of a single 15-to-20-year lease) introduce real non-renewal risk, but are favored by hyperscalers seeking maximum flexibility, and protection against obsolescence risk. 

• Power sources built and controlled by the data center developers (called 'behind-the-meter' power) bypass grid dependency, but they add project and performance risk, especially when the operator has no track record running power generation.

• Terminal value guarantees (TVGs) and termination fees can mitigate hyperscaler tenant walk-away risk. Hyperscalers generally have few easy "outs" from binding lease contracts once signed.

Access the full transcript and a searchable library of content at the Cool Vector Substack: https://coolvector.substack.com/p/what-might-throw-a-wrench-into-data?r=4tjd55

#coolvector #datacenters #infrastructure #creditratings #projectfinance #privatecredit

Fler avsnitt från "Cool Vector"