
0:00
11:38
In the biopharmaceutical industry, there has been a shift away from
on-site construction to prefabricated solutions. Peter Makowenskyj,
Director of Sales Engineering at G-CON Manufacturing Inc., recently
told Pharmaceutical Technology that speed to market and lower
total cost of ownership for facilities has accelerated this movement in the biopharma sector. He also discussed the strain that the COVID-19 pandemic has placed on operations across the industry and how the situation is creating a need for additional capacity.
More episodes from "The PODTalk PODcast"



Don't miss an episode of “The PODTalk PODcast” and subscribe to it in the GetPodcast app.





