Green Building Exam Prep podcast

The Implementation Phase: Green Construction and Beyond

0:00
2:42
Rewind 15 seconds
Fast Forward 15 seconds

Hey! I'd love to hear your thoughts, send me a voice note.

Green design only pays off if construction delivers it. This lesson covers the implementation phase of the integrated process: the construction plans that should never be overlooked (an erosion and sedimentation control plan with stormwater pollution prevention, a construction indoor air quality management plan, and a construction waste management plan that addresses recyclables), the difference between soft costs and hard costs, and why the integrative process continues after construction through training and orientation of the building's operations staff.

📚 Keep studying:

- LEED Green Associate Exam Prep Course: https://projectific.com/products/leed-green-associate-exam-prep

- Free LEED Green Associate exam prep (free practice exam, flashcards, and study guide sample): https://projectific.com/blogs/leed-green-associate/free-leed-green-associate-exam-prep

More at https://projectific.com

More episodes from "Green Building Exam Prep"