CCNS Update podcast

Alarming Problems with Proposed Tritium Venting at LANL

7/30/2025
0:00
4:34
Rewind 15 seconds
Fast Forward 15 seconds

To prepare for a public meeting with the U.S. Defense Nuclear Facilities Safety

Board (“the Board”) in Santa Fe on Monday evening, CCNS followed its policy of

reviewing at least the last eight weeks of the Board’s reports for Los Alamos National

Laboratory (LANL) and used that as a basis for questions and comments to present to

the Board. What we found:

More episodes from "CCNS Update"