Earthship podcast

Global Model Earthship for the world Tour with Michael Reynolds

3/8/2020
0:00
17:20
Manda indietro di 15 secondi
Manda avanti di 15 secondi

An overview of the the Global Model Earthship. How it works, all the design aspects. Construction Drawings on sale no at https://earthshipbiotecture.com/category/drawings/ from $595. 2 sets of stock off-grid construction drawings and 1 Off-Grid Mechanical Set and 1 Detail Set. Usually you don’t have to submit the detail and mechanical drawings with the permit application. Off-Grid Construction Drawings, Fossil Fuel Free Buildings. Live a sustainable life. Solar Electricity, CatchWater, Contained Waste Water Treatment, Passive Solar & Thermal Dynamics for Heating & Cooling, Food Production, Recycled Materials.

Altri episodi di "Earthship"