A replacement PLC can load the approved project and still be wrong for the process it controls. The backup may omit a calibration offset the plant now depends on. Restoring the latest runtime snapshot creates the opposite risk: bringing back an unapproved override or a manipulated setpoint.

This technical decision analysis examines what to restore from the approved engineering baseline, which retained values to recover selectively, and what evidence operations needs before re-energizing outputs. The key question: can your team prove that the restored controller is ready for the process as it exists today?