Checkpoint podcast

Advocacy group call for support on harbour crossing design

20.11.2026
0:00
5:48
Spol 15 sekunder tilbage
Spol 15 sekunder frem
A transport advocacy group is calling for the public to support its design for a new Auckland harbour crossing, which would be used alongside the existing bridge. Greater Auckland's six lane "multimodal bridge" would complement the current structure and cost in the region of five to six billion dollars. A Labour-government second crossing proposal in 2023 estimated costs at an average of $20 billion. Greater Auckland director, Patrick Reynolds spoke to Lisa Owen.

Flere episoder fra "Checkpoint"