DOF Talks podcast

Episode 3 - Live from Skandi Skansen

10.6.2022
0:00
26:40
Spol 15 sekunder tilbage
Spol 15 sekunder frem
We take you on board Skandi Skansen, one of the two vessels at Gulen assembly site, where the wind turbines headed for the Hywind Tampen floating wind farm will be assembled. We hear from Roger Storebø, the captain of Skandi Skansen, and the marine operations manager Rune Nilsen, as well as the shift supervisor Gary Bruce, who give us an insight into the work that goes into this huge task. Marianne is then joined by Camilla and Narve in studio, to talk about the safety aspect, which is our highest priority when working on these projects.

Hosted on Acast. See acast.com/privacy for more information.

Flere episoder fra "DOF Talks"