NukeTalk podcast

Atomic Assembly: Savannah River Site, South Carolina

1/5/2024
0:00
50:57
Manda indietro di 15 secondi
Manda avanti di 15 secondi

The US government poured $8 billion dollars down the drain when politics and poor planning left its efforts to dispose of Cold War-era plutonium at the Savannah River Site a failure. Now, it wants to produce plutonium pits at the site.

Guests include Tom Clements (Savannah River Site Watch) and Taylor Barnes (Field Reporter for Inkstick Media).

Altri episodi di "NukeTalk"